Project news: In order to install a 33-tonne transformer at a factory in Germany, it was necessary to load it onto the lowest possible flatbed. This was in order to first pass under a low obstacle and then to slide the transformer down the rails to its destination inside a building. The high payload with compact dimensions and good maneuverability of our low loader on pendulum axles made this possible.